ColdStream Energy field operations

Resources & News

Technical insights, case studies, and company updates

News and Updates

Case Studies

Iron Horse Midstream pipeline installation in the Delaware Basin

Case Study — Iron Horse Midstream

Optimizing Through put and Recovery in the Delaware Basin

95%

NGL Recovery

8%

Engine Derating Reduction

Gas processing equipment on a well pad

Sample: Case Study — Permian Basin Operator

Sample: Cutting Fuel Gas BTU on a Multi-Well Pad

91%

NGL Recovery

6%

Engine Derating Reduction

Gathering system pipework at a compressor station

Sample: Case Study — Eagle Ford Gathering

Sample: Stabilising Inlet Composition Across Seasons

99%

System Uptime

70%

VOC Reduction

Skid-mounted processing unit at a remote site

Sample: Case Study — Rockies Midstream

Sample: Modular Deployment at a Remote Compressor Site

2 wks

Time to Commission

$272K

NGLs Recovered